Scope Gap Analysis

Scope Analysis

AI-powered scope gap detection and risk assessment

Upload More
3
Scope Gaps
5
Clarifications Needed
12
Items Identified
$85K
Est. Value

Scope Gaps Detected

1

Hardware Allowance Not Specified

Section 06 4100 mentions "hardware by millwork contractor" but no allowance amount is provided. Similar projects typically range $2,500-$5,000.

2

Install Location Access Unclear

Drawing A-501 shows reception desk in lobby, but no information about elevator access or staging area. May require after-hours delivery.

3

Finish Sample Approval Process

Custom stain specified (WS-CUSTOM-47) but no reference sample or approval process documented. Suggest requesting physical sample approval.

Clarifications Needed

  • AWI Grade verification for break room casework

    Spec says "Premium" but detail shows exposed particleboard edges

  • Confirm countertop material at coffee bar

    Finish schedule says "Solid Surface" but keynote references quartz

  • Back panel material for conference credenza

    No back panel material specified. Assume 1/4" finished panel?

  • Electrical coordination for reception desk

    Grommets shown but no power/data requirements listed

  • Edge banding profile on adjustable shelves

    PVC or wood? Thickness not specified

Items Identified

  • Reception Desk 1 EA

    Custom curved design, walnut veneer

  • Base Cabinets 12 LF

    Break room, PLAM doors

  • Upper Cabinets 8 LF

    Break room, PLAM doors

  • Conference Credenza 1 EA

    8' wide, wood veneer

  • Wall Panels 240 SF

    Lobby feature wall

  • Solid Surface Counters 18 LF

    Break room + coffee bar